Preventive
Preventive measures are to be taken based on a prediction before it
happened. The following preventive measures are recommended for flash flood:
• Development of proper drainage system
• Proper and timely warning system
• Strengthening the bank of wetlands/river
• Strengthening and raising field bund
• Community nursery should be adopted.
• This district have sporadic flood, hence selection of a suitable variety of short or medium duration (based on time left in cropping period) after receeding of water is helpful.