Nutrient management

  •  1. Nursery bed application

    Apply 8-10 kg neem cake and 10-15 kg vermicompost in 800/sq m area during the last land preparation. Pests in the nursery can be managed by application of  4-5 kg ha-1 bio-control agent mixture (mixed with well-decomposed farmyard manure) 10-12 days before sowing.

    2. Nutrient management

    •          Sowing of dhaincha should be done towards the end of May either with pre-sowing irrigation or after pre-monsoon rainfall. In should be incorporated in the field at the vegetative stage around 40-45 DAS     or ex-situ green manuring with gliricidia leaves @5 t ha-1.
    •          Apply groundnut or neem cake @ 15 q ha-1 as basal manure or
    •          Apply 5-10 q ha-1 vermicompost or
    •          Apply 1.25 t ha-1 goat droppings or 1.25 t ha-1 poultry manure.
    •          The co-culture of Azolla (10-15 t fresh weight per ha) with rice can be done.
    •          10 kg ha-1 blue-green algae can be applied at 6-7 days after transplanting.